Terminal 4 – Displacement of EL AL Airlines from T1 to T4

Project Description

These screeding works were associated with a Terminal 4 project aimed at accommodating the displacement of EL AL Airlines from Terminal 1 to Terminal 4.

To facilitate the move it was necessary to demolish some existing terminal facilities to form a new Retail Store area. Once the facilities had been demolished, the existing floor screed was removed due to a number of floor level changes that required levelling out. Contour secured the contract to install 250 sqm of ‘unbonded’ K-Screed which was installed over a two-night period.

K-Screed was chosen as it offered the client the most versatile finish given the environmental constraints.

Project Details
Date: July 2016
Client: Balfour Beatty